The Log Home Neighborhood

An online log home community for log home enthusiasts.

New here so go easy! 

Bought a cabin (21 x 17') that was built 20 years ago and never finished. Builder did not pre drill or route during build for electrical.

I am wanting to surface mount all the electrical just around the perimeter of the logs (one room) and was hoping to use FMC conduit to all the electrical boxes.  

Has anybody done this? Is EMT the better route? 

Thanks,

Mark

Views: 6

Comment

You need to be a member of The Log Home Neighborhood to add comments!

Join The Log Home Neighborhood

© 2020   Created by Neighborhood Host.   Powered by

Guide to Log Homes | Advertise | Badges  |  Report an Issue  |  Terms of Service